The second most-asked question we get — right after price — is “when will I have it?” Fair question, and the honest answer depends entirely on one choice. This guide explains cement tile lead times: what in-stock really means, what custom production involves, and how to plan a project around each.
In-stock: days, not months
Everything in our in-stock collections sits palletized in our Laredo, TX warehouse. Order confirmed, freight booked, and it ships within days — transit adds roughly 2-7 business days depending on your state. From click to curb, figure one to two weeks. That timeline covers every pattern, hex, fishscale color and breeze block on the in-stock list.

Flor de México Mohave, in stock: this floor can exist at your house in two weeks.
Custom: 6-8 weeks of real craft
A custom order — your palette on an existing pattern, or your own design — goes into production at the factory: molds prepared, each tile hand-poured, cured properly (curing is most of the calendar; rushing it is how other people’s tiles crack), inspected, palletized, shipped. Plan 6-8 weeks of production plus freight. The full journey is in the custom design guide.

A custom colorway like this lobby wall is worth six weeks — if those weeks are in the plan.
The planning math by project date
Installing within a month? In-stock is your catalog. Spring project? Custom ordered in November-December lands with time to spare. Commercial opening date? Work backwards: opening minus install time minus 2 weeks buffer minus lead time equals your order deadline — and tell us the date, because we schedule production against real deadlines daily. The decision framework is in in-stock vs. custom.

Hotel projects live on lead times: this wall opened on schedule because the order did.
Freight: the overlooked week
Tile ships on pallets by freight carrier, not parcel — delivery needs a liftgate or a dock, and inspection at receipt matters. Five minutes with our freight guide prevents the surprises that add days.
Lock your timeline
Tell us your install date and we’ll tell you which path gets there — or start with samples (those ship parcel, fast) while you decide. Quantities first, as always: How Many Tiles Do I Need?



